山東模具制造廠家為什么要試模?山東模具制造廠家經(jīng)常會遇到新產(chǎn)品開發(fā)及老模具的更新,但很多情況下都會因為這個原因那個操作的出現(xiàn)不好,所以要通過試模對模具制作中的一些問題加以檢驗和修正。
Shandong mold manufacturers why to try the mold? Shandong mold manufacturers often encounter new product development and old mold update, but in many cases, because of this reason, the operation is not good, so it is necessary to test and correct some problems in mold production through mold trial.
山東模具廠家生產(chǎn)的模具都希望是“適應(yīng)性”好(即成型參數(shù)或工藝條件寬)的模具。但在生產(chǎn)過程中,由于設(shè)計考慮不好或加工不充分,經(jīng)常會出現(xiàn)一些問題,如尺寸過大、局部過渡不平滑、結(jié)構(gòu)不合適等,導(dǎo)致鑄件或試模不合格,而試用是找出模具問題的一種簡單直接的方法。
Shandong mold manufacturers hope to produce molds that are "adaptable" (that is, forming parameters or process conditions wide). But in the production process, because the design consideration is not good or processing is not sufficient, often there will be some problems, such as too large size, local transition is not smooth, the structure is not suitable, leading to the casting or mold test is unqualified, and trial is a simple and direct method to find out the mold problem.
找出更好的成型條件在試模過程中,試模員可以找到一組合適的工藝數(shù)據(jù),這組數(shù)據(jù)可以作為批量生產(chǎn)時設(shè)置機器參數(shù)的默認(rèn)值,并據(jù)此進行調(diào)整數(shù)據(jù)集模具批量生產(chǎn)的工藝條件。驗證CAE輔助設(shè)計并提高后續(xù)工作效率的CAE分析軟件是根據(jù)真機規(guī)格、真合金性能和真實外部環(huán)境,通過計算機模擬,將模擬計算的結(jié)果。
In the process of mold testing, the tester can find a suitable set of process data, which can be used as the default value of machine parameters set during mass production, and adjust the process conditions of mold mass production based on the data set. Verify CAE aided design and improve the follow-up work efficiency of CAE analysis software is according to the real machine specifications, real alloy properties and real external environment, through computer simulation, will simulate the results of calculation.
模具設(shè)計人員根據(jù)模擬情況對模具設(shè)計進行相應(yīng)修正;分析數(shù)據(jù)在真機試模時可直接作為預(yù)設(shè)值輸入,山東模具廠家可借此檢查分析模具設(shè)計是否有欠缺。測試模塊的不足之處可以與仿真結(jié)果進行對比分析,為后續(xù)工藝參數(shù)設(shè)置提供依據(jù)。
The mold designer revises the mold design according to the simulation; The analysis data can be directly input as the default value when the real machine tries the mold. Shandong mold manufacturer can check whether there is any deficiency in the analysis mold design. The shortcomings of the test module can be compared with the simulation results to provide a basis for the subsequent process parameter setting.
山東模具制造廠家試模的主要目的是找出優(yōu)化的工藝參數(shù)和模具修改方案,要求即使材料、機器等因素,也能保證模具穩(wěn)定、不間斷地量產(chǎn)合格。設(shè)置或環(huán)境已更改。產(chǎn)品,提高模具的“適應(yīng)性”,而不是僅僅為了得到幾個好的試用樣品。
The main purpose of shandong mold manufacturer's mold test is to find out the optimized process parameters and mold modification plan, even if the material, machine and other factors, can ensure the mold stable, uninterrupted mass production qualified. The Settings or environment have changed. Product, improve mold "adaptability", not just to get a few good trial samples.
山東模具制造廠家為什么要試模?內(nèi)容便是以上講解了,可以說真的是有必要對制作完成的模具進行試模,這樣才能出產(chǎn)出質(zhì)量好的使用率高的注塑加工產(chǎn)品。更多內(nèi)容的了解就來我們網(wǎng)站
m.tongbang.net.cn看看吧。
Shandong mold manufacturers why to try the mold? Content is the above explanation, you can really say that it is necessary to complete the production of the mold for testing, so as to produce good quality injection molding products with high utilization rate. For more information, please visit our website m.tongbang.net.cn.